the mom milk lab.
| 더맘유가공연구소
location | taean, chungcheongnam-do
site area | 1,010㎡
floor | 1F , B1F
building area | 150.89㎡
gross floor area | 199.68㎡
structure | steel
design & construction period | 2019.03 – 2020.02
location | taean, chungcheongnam-do
site area | 1,010㎡
floor | 1F , B1F
building area | 150.89㎡
gross floor area | 199.68㎡
structure | steel
design & construction period | 2019.03 – 2020.02